Port Facts

Port of NEOM offers advanced, tech‑enabled cargo handling facilities to meet diverse shipping needs. Terminal 0 (T0) is operational while Terminal 1 (T1) expands. Operations are driven by efficiency, precision, and a commitment to sustainable practices.

scroll
    • General Port Operations
      4
      berths accommodating various vessel types in T0; 2 planned berths in T1
      200,000sqm
      general cargo capacity in T0
      46,000sqm
      of ambient, chilled and frozen storage capacity at T0
      250,000 TEU
      current container capacity; T1 planned expansion to 1.5M TEU
    • Quay Walls
      1125m
      Current quay length; additional 900m with T1 expansion
      402m
      container and general cargo quay
      228m
      general cargo quay
      421m
      Roll‑on/Roll‑off (RoRo) quays with flexible lift ramps
    • PoN

      Specialized Equipment
      10
      Mobile harbour cranes
      3
      Tug boats
      300
      reefer plugs
      100+
      Reach stackers, terminal tractors, forklifts and other specialist equipment
      T1 Equipment
      Planned 30 eRTGS and 10 STS cranes
      PoN

    Stay Connected

    Sign up to receive Port of NEOM’s latest updates, news, and insights directly in your inbox.

    Thanks for subscribing to NEOM S.C.

    an error has occurred, please try again

    Thanks for subscribing to Port of NEOM newsletter